Modelling construction scheduling constraints using shapes constraint language (SHACL)
File | Description | Size | Format | |
---|---|---|---|---|
Contribution_170_final.pdf | Published version | 308.51 kB | Adobe PDF | View/Open |
Title: | Modelling construction scheduling constraints using shapes constraint language (SHACL) |
Authors: | K Soman, R |
Item Type: | Conference Paper |
Abstract: | This paper presents a new approach for modelling construction scheduling constraints using Shapes Constraint Language. Current modelling approaches focuses on modelling precedence and discrete constraints at master planning or phase planning level and lacks the ability to model complex constraints at look ahead planning level. Proposed modelling approach addresses this limitation. Precedence constraints, discrete resource capacity constraints, disjunctive constraints and logical constraints are modelled using shapes constraint language for a simple lifting problem in this paper. The modelled constraints were tested, and the constraints model was able to identify the violations effectively and produce a validation report. |
Issue Date: | 10-Jul-2019 |
Date of Acceptance: | 10-Jul-2019 |
URI: | http://hdl.handle.net/10044/1/73677 |
DOI: | https://doi.org/10.35490/ec3.2019.170 |
ISBN: | 9781910963371 |
Publisher: | University College Dublin |
Journal / Book Title: | Proceedings of the 2019 European Conference for Computing in Construction |
Copyright Statement: | © 2019 The Authors. |
Sponsor/Funder: | Bentley Systems UK The Alan Turing Institute |
Conference Name: | 2019 European Conference on Computing in Construction |
Publication Status: | Published |
Start Date: | 2019-07-10 |
Finish Date: | 2019-07-12 |
Conference Place: | Chania, Crete, Greece |
Open Access location: | http://www.doi.org/10.35490/EC3.2019.170 |
Online Publication Date: | 2019-07-10 |