Repository logo
  • Log In
    Log in via Symplectic to deposit your publication(s).
Repository logo
  • Communities & Collections
  • Research Outputs
  • Statistics
  • Log In
    Log in via Symplectic to deposit your publication(s).
  1. Home
  2. Faculty of Engineering
  3. Faculty of Engineering
  4. Cost-Benefit Analysis of Unreliable System Protection Scheme Operation
 
  • Details
Cost-Benefit Analysis of Unreliable System Protection Scheme Operation
File(s)
Calvo Ramirez Tindemans Strbac PowerTech final.pdf (390.29 KB)
Accepted version
Author(s)
Calvo, JL
Ramirez Torrealba, PJ
Tindemans, S
Strbac, G
Type
Conference Paper
Abstract
System Protection Schemes (SPS) have the potential to greatly enhance the utilization of the network, often by automatically disconnecting generators in response to contingency events. However, malfunctions of such systems may expose the system to harmful blackouts. The operation of unreliable SPS is therefore subject to a cost-benefit balance between the benefits of increased system utilization and the risk of outages. This paper studies this trade-off in a year-round basis. The problem is firstly stated from a centralized perspective to probabilistically minimize the operational costs for a whole operating year. A case study based on a basic simple representation of the Great Britain system is considered. The results show great annual benefits from equipping the SPS with multiple generation disconnection systems, which are mainly associated with critical operating conditions. However, it is demonstrated that redundant SPS configurations do not necessarily reduce the levels of operational risk exposure.
Date Issued
2015-06-29
Date Acceptance
2015-04-16
Citation
2015
URI
http://hdl.handle.net/10044/1/29786
DOI
https://www.dx.doi.org/10.1109/PTC.2015.7232640
Publisher
IEEE
Copyright Statement
© 2015 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works.
Sponsor
National Grid Electricity Transmission Plc
Grant Number
PO 3200342629/ TAO/22046
Source
IEEE PowerTech 2015
Publication Status
Published
Start Date
2015-06-28
Finish Date
2015-07-02
Coverage Spatial
Eindhoven
About
Spiral Depositing with Spiral Publishing with Spiral Symplectic
Contact us
Open access team Report an issue
Other Services
Scholarly Communications Library Services
logo

Imperial College London

South Kensington Campus

London SW7 2AZ, UK

tel: +44 (0)20 7589 5111

Accessibility Modern slavery statement Cookie Policy

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback