Flexible operation of CSIRO's post-combustion CO2 capture pilot plant at the AGL Loy Yang power station
File(s)
Author(s)
Bui, Mai
Gunawan, Indra
Verheyen, Vincent
Feron, Paul
Meuleman, Erik
Type
Journal Article
Abstract
Flexible operation has the potential to significantly improve the economic viability of post-combustion CO2 capture (PCC). However, the impact of disturbances from flexible operation of the PCC process is unclear. The purpose of this study was to investigate the effects of flexible operation in a PCC pilot plant by implementing step-changes for improved dynamic data reliability. The flexible operation campaign was conducted at the CSIRO PCC pilot plant at AGL Loy Yang using monoethanolamine (MEA) absorbent. The pilot plant was operated under a broad range of transient conditions (changing flue gas flow, liquid absorbent flow and steam pressure) to capture the dynamics of a PCC process during flexible operation. The study demonstrated that the dynamics of flue gas flow rate was faster than absorbent flow rate. The greatest CO2 removal% was achieved at the lowest flue gas flow rate or at the highest absorbent flow rate; however, the latter provided improved energy efficiency. The steam pressure parameter could adjust the temperature of all columns simultaneously which can be used to compensate for effects from ambient conditions or heat losses. These results verify the technical feasibility of flexible PCC operation and provide a suitable dataset for dynamic model validation.
Date Issued
2016-01-15
Date Acceptance
2015-12-14
Citation
International Journal of Greenhouse Gas Control, 2016, 48 (P2), pp.188-203
ISSN
1750-5836
Publisher
Elsevier
Start Page
188
End Page
203
Journal / Book Title
International Journal of Greenhouse Gas Control
Volume
48
Issue
P2
Copyright Statement
© 2016, Elsevier. Licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International http://creativecommons.org/licenses/by-nc-nd/4.0/
Subjects
04 Earth Sciences
05 Environmental Sciences
09 Engineering
Energy
Notes
publisher: Elsevier articletitle: Flexible operation of CSIRO's post-combustion CO2 capture pilot plant at the AGL Loy Yang power station journaltitle: International Journal of Greenhouse Gas Control articlelink: http://dx.doi.org/10.1016/j.ijggc.2015.12.016 content_type: article copyright: © 2015 Elsevier Ltd. All rights reserved.
Publication Status
Published